Project Overview
Location: Keston, Bromley
Duration: Autumn 2023 – Summer 2024
Original House: 3 bedrooms, 1 bathroom, 110 sq metres
New House: 5 bedrooms, 3 bathrooms, 280 sq metres

Project Scope
Frontline Construction undertook a comprehensive renovation of a modest 3-bedroom, 1-bathroom house, transforming it into a luxurious, practical, and eco-friendly 5-bedroom, 3-bathroom family home. The project involved more than doubling the size of the existing property, from 110 square metres to 280 square metres, creating an open-plan living space ideal for modern family life.
The Renovation Process
Initial Consultation:
The project began with an in-depth consultation with the client to understand their vision and requirements. Frontline Construction’s team of architects and designers worked closely with the client to develop a plan that maximised the potential of the existing property.
Design and Planning:
Detailed architectural drawings and 3D models were created to visualise the transformation. The design included expanding the living space, integrating modern amenities, and ensuring the home was eco-friendly and sustainable.
Construction Phase:
The construction phase commenced in Autumn 2023, whereby the existing structure was carefully demolished and extended. New rooms were added, and the entire house was reconfigured to enhance flow and functionality. State-of-the-art insulation and renewable energy systems were installed to improve energy efficiency.
Interior Fit-Out:
The interior fit-out involved installing underfloor heating, a custom kitchen, and smart home technology. High-quality materials and finishes were used throughout to create a luxurious yet practical living environment. The bespoke kitchen, a focal point of the home, was crafted to include modern appliances and a unique dog bed area, combining style and functionality.
One of the client’s goals was to make their home as eco-friendly and economical to run as possible. The Frontline Team team disconnected the gas supply and implemented an air source heat pump for renewable heating, plus installed underfloor heating throughout the house, converting the house into an eco-friendly dwelling. Enhanced insulation ensured a consistent temperature year-round, meaning that the home is now economical to run.
When it came to creating a functional ‘smart home’, Frontline installed voice-activated smart lighting to control heating, lights, and blinds, enhancing convenience and energy efficiency.
Exterior Completion:
The final phase included the installation of a resin driveway and the creation of a low-maintenance garden. The outdoor space was designed to be both beautiful and practical, providing a safe and enjoyable area for the family dog.
Client Satisfaction
The project was completed in Summer 2024, on time and within budget. The client was thrilled with the transformation, particularly the seamless integration of luxury and practicality. The new home not only met but exceeded their expectations, offering a comfortable, energy-efficient, and stylish living space tailored to their needs.
Frontline Construction is proud to have delivered this project in Keston that showcases our commitment to quality, innovation, and customer satisfaction. This whole house renovation highlights our ability to transform ordinary spaces into extraordinary homes, combining luxury with sustainability.